Slashdot: Hardware's Journal
 
[Most Recent Entries] [Calendar View]

Friday, May 23rd, 2025

    Time Event
    10:00a
    Jony Ive's Futuristic OpenAI Device Like a Neck-Worn iPod Shuffle
    OpenAI on Wednesday announced that it was paying $6.5 billion to buy io, a one-year-old start-up created by Jony Ive. While the company remains tightlipped about the futuristic AI device(s) it has in the works, Apple supply chain analyst Ming-Chi Kuo shared some alleged details about its design. MacRumors reports: In a social media post today, Kuo said the device will be "slightly larger" than Humane's discontinued AI Pin. He said the device will look "as compact and elegant as an iPod Shuffle," which was Apple's lowest-priced, screen-less iPod. The design of the iPod shuffle varied over the years, going from a compact rectangle to a square. Like the iPod shuffle, Kuo said OpenAI's device will not have a screen, but it would connect to smartphones and computers. The device will be equipped with microphones for voice control, and it will have cameras that can analyze the user's surroundings. He said that users will be able to wear the device around their necks, like a necklace, whereas the AI Pin can be attached to clothing with a clip. Kuo expects OpenAI's device to enter mass production in 2027, and the final design and specifications might change before then. Kuo expects OpenAI's device to enter mass production in 2027, and the final design and specifications might change before then.

    Read more of this story at Slashdot.

    8:01p
    Spanish Grid Operator Faults Big Power Plants in Blackout Blame Game
    Spain's grid operator has accused some large power plants of not doing their job to help regulate the country's electricity system in the moments before last month's catastrophic blackout across the Iberian peninsula. From a report: Beatriz Corredor, chair of grid operator Red Electrica's parent company, said power plants fell short in controlling the voltage of the electricity system. However, the heads of Spain's biggest plant owners linked the blackout to a lack of grid investment and insufficient efforts to boost electricity demand. The public blame game over the outage is intensifying as more than three weeks after 60 million people were left without power, Spanish government investigators insisted they needed more time to establish the root cause.

    Read more of this story at Slashdot.

    11:20p
    Trump Launches Reform of Nuclear Industry, Slashes Regulation
    Longtime Slashdot reader sinij shares a press release from the White House, outlining a series of executive orders that overhaul the Nuclear Regulatory Commission and speed up deployment of new nuclear power reactions in the U.S.. From a report: The NRC is a 50-year-old, independent agency that regulates the nation's fleet of nuclear reactors. Trump's orders call for a "total and complete reform" of the agency, a senior White House official told reporters in a briefing. Under the new rules, the commission will be forced to decide on nuclear reactor licenses within 18 months. Trump said Friday the orders focus on small, advanced reactors that are viewed by many in the industry as the future. But the president also said his administration supports building large plants. "We're also talking about the big plants -- the very, very big, the biggest," Trump said. "We're going to be doing them also." When asked whether NRC reform will result in staff reductions, the White House official said "there will be turnover and changes in roles." "Total reduction in staff is undetermined at this point, but the executive orders do call for a substantial reorganization" of the agency, the official said. The orders, however, will not remove or replace any of the five commissioners who lead the body, according to the White House. Any reduction in staff at the NRC would come at time when the commission faces a heavy workload. The agency is currently reviewing whether two mothballed nuclear plants, Palisades in Michigan and Three Mile Island in Pennsylvania, should restart operations, a historic and unprecedented process. [...] Trump's orders also create a regulatory framework for the Departments of Energy and Defense to build nuclear reactors on federal land, the administration official said. "This allows for safe and reliable nuclear energy to power and operate critical defense facilities and AI data centers," the official told reporters. The NRC will not have a direct role, as the departments will use separate authorities under their control to authorize reactor construction for national security purposes, the official said. The president's orders also aim to jump start the mining of uranium in the U.S. and expand domestic uranium enrichment capacity, the official said. Trump's actions also aim to speed up reactor testing at the Department of Energy's national laboratories.

    Read more of this story at Slashdot.

    << Previous Day 2025/05/23
    [Calendar]
    Next Day >>

Slashdot: Hardware   About LJ.Rossia.org